“According to the hall flood in 2013 has been investigating the bridge-intensive. Experts have found that the flood has moved the building,“ said the Baugeordnete for the development of the city, René vines peat, the MZ.

Although the bridge is currently as safe, “however, is a redevelopment from an economic point of view makes no sense”. Currently we are in the planning phase. How exactly will the new bridge is to be built, is still open. Fund hall wants to help the cost of the flood.

in Addition, peat Vines, bridges for pedestrians and cyclists from the Franz-Schubert-Straße to Sophie port and from there to the sand anger is a done deal. The design of these two buildings, he’ll deal, announced vine peat on MZ-demand. (mz)

This article was written by Dirk Skrzypczak

*The contribution of “planning for demolition and new construction: Three new hall bridges hall” comes from the mitteldeutsche Zeitung. There is no editorial review by FOCUS Online. Contact with the executives here.

Central German newspaper

LEAVE A REPLY

Please enter your comment!
Please enter your name here